Oil and Gas Information Agency
about you, about us,
about oil, about gas
18+

Transneft expects normal loading of Druzhba to be restored within 2-3 months

June 13/ 09:06

Moscow. The loading of the Druzhba pipeline may be restored to the level prior to the incident with contamination and subsequent transit suspension within the next 2-3 months, Vice President of Russia’s pipeline operator Transneft Rashid Sharipov told a telephone conference, informs TASS.

"Regarding Druzhba loading, we expect to return to the normal level within 2-3 months," he said.

 

 

 

Views 186
Comments
You may leave a comment: